What happened
As it headed out of Baltimore Harbor, about 50 minutes after leaving its berth, the Dali lost electrical power, and with it propulsion and steering. It struck Pier 17, the southern pier holding up the bridge's central span. [Final report MIR-25-40]
A large part of the bridge collapsed into the river and onto the ship's bow. A seven-person road maintenance crew and an inspector were on the bridge. [Final report MIR-25-40]
Traffic onto the bridge had been stopped about 48 seconds before the ship hit it. [Final report MIR-25-40]
Probable cause
The NTSB determined that the probable cause of the Dali striking the bridge was a blackout: one signal wire in the ship's switchboard had a loose connection to its terminal block, because a wire-label sleeve had been put on in a way that kept the wire from seating fully. The blackout cost the ship propulsion and steering close to the bridge, and being that close left too little time to recover propulsion. Contributing to the collapse and the loss of life was the lack of countermeasures to make the bridge less vulnerable to strikes by ocean-going ships, which the NTSB says could have been put in place if the Maryland Transportation Authority had done the vulnerability assessment AASHTO recommends. Also contributing to the loss of life was the lack of an effective, immediate way to tell the highway workers to leave the bridge. [Final report MIR-25-40]
What the NTSB found
- The loose wire caused the first blackout under way: it tripped a breaker that cut power to the ship's low-voltage systems, including its steering pumps and the engine's cooling pump. [Final report MIR-25-40]
- Thermal imaging during routine maintenance might have revealed the loose wire. [Final report MIR-25-40]
- A vulnerability assessment would have shown the bridge was almost 30 times above the risk threshold for catastrophic collapse from a vessel strike set by AASHTO, the association of state highway and transportation officials. [Final report MIR-25-40]
- In March 2025, the NTSB found that the 30 owners of 68 other bridges were likely unaware of their bridges' collapse risk. [Final report MIR-25-40]
- Quick action by the pilots, their dispatcher and the Maryland Transportation Authority to stop traffic prevented a greater loss of life. [Final report MIR-25-40]
- Had the workers been warned when police were, they may have had time to drive to a part of the bridge that did not fall. [Final report MIR-25-40]
Key safety recommendations
The final report made 18 new recommendations, on top of 4 urgent ones issued in March 2025. Some of the most significant: [Final report MIR-25-40]
- H-25-1 To Federal Highway Administration: Set up a team, with the Coast Guard and Army Corps of Engineers, to help bridge owners assess and reduce the risk of collapse from vessel strikes (urgent, March 2025). [Final report MIR-25-40]
- H-25-3 To 30 bridge owners (68 bridges): Calculate each bridge's annual frequency of collapse from vessel strikes using AASHTO's Method II and tell the NTSB whether it is above the AASHTO threshold (urgent, March 2025). [Final report MIR-25-40]
- H-25-4 To 30 bridge owners (68 bridges): If a bridge is above the risk threshold, develop and carry out a full plan to reduce that risk (urgent, March 2025). [Final report MIR-25-40]
- H-25-31 To ANSI construction safety standards committee (A10): Revise its work-zone safety standard (A10.47) to require a fast, effective way to alert workers on bridges over navigable waters in an emergency. [Final report MIR-25-40]
- M-25-23 To HD Hyundai Heavy Industries (the shipbuilder): Add proper wire-label installation methods to its electrical procedures. [Final report MIR-25-40]
Official NTSB links
- Final report MIR-25-40 (PDF)https://www.ntsb.gov/investigations/AccidentReports/Reports/MIR2540.pdf
- Investigation pagehttps://www.ntsb.gov/investigations/Pages/DCA24MM031.aspx
- Board meeting, November 18, 2025https://www.ntsb.gov/news/events/Pages/DCA24MM031-BMG.aspx
- Board meeting video (NTSB on YouTube)https://www.youtube.com/watch?v=eFS9sGiKTeA
- Public dockethttps://data.ntsb.gov/Docket/?NTSBNumber=DCA24MM031
- Urgent bridge recommendations, March 2025 (MIR-25-10, PDF)https://www.ntsb.gov/investigations/AccidentReports/Reports/MIR2510.pdf
- Preliminary report (PDF)https://www.ntsb.gov/investigations/Documents/DCA24MM031_PreliminaryReport%203.pdf
Watch our clips on this case
- 6 seconds, 100 alarms: could the Dali's crew react?Short · YouTube
- Could the Dali's crew have restarted the engine in time?Short · YouTube
- When was the Dali's switchboard last inspected?Short · YouTube
Status and links last checked against ntsb.gov on November 25, 2026. Every statement above links to the NTSB document it comes from.